# Agile Fixed Price: Predictable Planning Without the Waterfall Model

The agile fixed price combines budget certainty with the flexibility of agile
development. Within a fixed budget framework, requirements can be adjusted
during the project. Since 2012, arocom has offered this model for Drupal
projects and tested it in over 160 Drupal projects. The result: clients have cost
control without having to commit to every detail before the project starts.
The prerequisite is mutual trust and close collaboration in sprints.

## Agile Fixed Price: Predictable Planning Without the Waterfall Model

"What does the project cost?" is the first question. "What exactly
do you want?" is the right counter-question. The problem: in complex
Drupal projects, requirements cannot be fully specified before the
project starts. The traditional fixed price forces both sides into
a corset that does not fit.

The agile fixed price solves this dilemma. The budget is fixed.
The requirements are refined and prioritized during the project.

## Traditional Fixed Price vs. Agile Fixed Price

The traditional fixed price works with clearly defined requirements.
If you know exactly what you need and nothing changes during
implementation, a fixed price is efficient. In practice, something
almost always changes in Drupal projects.

The traditional fixed price responds to changes with change
requests, renegotiations, and delays. The vendor calculates a
risk buffer that the client pays for.

The agile fixed price defines a budget framework and scope at
an abstraction level (epics). Development proceeds in prioritized
sprints. After each sprint, the client decides whether the
direction is right and what gets implemented next.

Changes are not a contract problem but the norm. What changes
is traded against equivalent requirements. The budget stays the
same; the scope becomes optimal.

## How the Agile Fixed Price Works at arocom

Step 1, Scoping: In a joint workshop, we develop the main goals
and requirements at the epic level. We estimate effort and define
the budget framework.

Step 2, Test sprints: 2-3 sprints in which both sides test
the collaboration. The result: first functional deliverables
and a validated effort estimate.

Step 3, Binding framework: Based on the test sprints, the
fixed price framework is contractually established. Both sides
now know what is realistic.

Step 4, Implementation in sprints: Prioritized development with
sprint reviews. The client has a functional product and budget
control after each sprint.

This model requires trust. In over 160 Drupal projects since 2012,
arocom has shown that this trust is justified. No risk buffer at
the client's expense, no hidden effort.

### Your next step

Planning a Drupal project and want to combine budget certainty
with flexibility? Start with the [Drupal Future Check](https://www.arocom.de/en/future-check):
it gives you the foundation for a realistic effort estimate.

**From arocom projects:**

- [haustec.de](https://www.arocom.de/en/references/haustec), a trade portal with daily editorial output, we tuned with Varnish, Redis, and Drupal's internal cache to keep LCP under 1.5 s, even at peak traffic.
- Hopt + Schuler needs job openings on the careers page in real time, sourced from the JobCluster system. We delivered this via a custom module against the JobCluster API, vacancies appear without manual upkeep, the recruiting workflow runs centrally in JobCluster, the site reads live.

### Is the agile fixed price more expensive than a traditional fixed price?

No. With the traditional fixed price, the vendor calculates a risk buffer. With the agile fixed price, this buffer is eliminated because risks are reduced through close collaboration and regular adjustments. The end result better matches what you actually need.

### What happens when the budget is used up but features are missing?

Through continuous prioritization, the most important features are implemented first. After each sprint, you have a functional product. When the budget is used up, the least important features are missing, not the critical ones.

### For which project size is the agile fixed price suited?

For complex projects from approximately 30,000 euros. For smaller projects with clear requirements, a traditional fixed price is more efficient. arocom advises you on the right model in the initial consultation.

## Read more

- [Scrum in Drupal Projects](https://www.arocom.de/en/knowledge/development/scrum): The methodology behind the agile fixed price
- [Project Management for Web Projects](https://www.arocom.de/en/knowledge/development/project-management): What we learned in 160+ Drupal projects
- [Planning a Website Relaunch](https://www.arocom.de/en/knowledge/development/relaunch): The arocom guide