# Scrum in Drupal Projects: Methodology Meets CMS Reality

Scrum is an agile framework that breaks large tasks into manageable
sprints. In Drupal projects, Scrum meets CMS-specific requirements:
content migration, module dependencies and editor feedback must be
integrated into the process. Since 2012, arocom has worked with adapted
Scrum in over 160 Drupal projects. The result: clients see a working
partial result after every sprint and can correct direction before the
budget is spent.

## Scrum in Drupal Projects: Methodology Meets CMS Reality

Scrum by the book assumes a team that builds a product from
scratch. Drupal projects are different: you work with an
existing ecosystem of modules, configurations and content.
Pure textbook Scrum doesn't fit, adapted Scrum does.

## Scrum Basics for Drupal Projects

Sprints: fixed time periods of 2 weeks in which defined work
packages are implemented. After each sprint, there is a
demonstrable result.

Backlog: the prioritized list of all requirements. The product
owner decides what comes next. The team estimates the effort.

Sprint review: at the end of each sprint, the client sees the
result. Feedback flows directly into the next sprint.

Retrospective: the team reflects on what worked and what didn't.
Continuous improvement of the process.

## How arocom Adapts Scrum for Drupal

Content sprints: parallel to development, there are content
sprints in which editors create and review content. Content and
technology develop synchronously.

Module evaluation: before a sprint, the team evaluates whether
contrib modules cover the requirements or custom development
is needed. This prevents surprises during the sprint.

Configuration management: Drupal configurations are versioned
and deployed per sprint. Each sprint delivers a complete,
deployable increment.

Editor involvement: editors test the result at the end of each
sprint. Their feedback is just as valuable as the product
owner's feedback.

## Why Scrum Works for Drupal Projects

Early visibility: after the first sprint, the client sees a
working website, not mockups or wireframes but real
functionality in the browser.

Course correction: every 2 weeks, the client can adjust
priorities. This prevents: "That's not what we wanted" at
the project end.

Budget control: the agile fixed price gives budget certainty.
Within the budget, the scope is optimized sprint by sprint.

Risk reduction: problems surface after 2 weeks, not after 6
months. Small issues are easy to fix; large ones are expensive.

### Your next step

Want to work agile on your Drupal project? The
[Drupal Future Check](https://www.arocom.de/en/future-check) is the first sprint:
it delivers results in 2 weeks and forms the basis for all
further sprints.

**From arocom projects:**

- Drupal as a dashboard platform? For marego it was exactly the right choice: editable data structures, granular roles, integrated Excel/PDF pipelines. The tool now consolidates reporting that used to live in five different tools.
- For [d&b audiotechnik](https://www.arocom.de/en/references/db-audiotechnik) (Backnang) we built several configurators, process tools, and intranet solutions on/with Drupal, the architecture we put in place back in 2018 still holds today without refactoring and keeps up with every new major version.

### Do we need full Scrum for every project?

No. Small projects work well with Kanban. arocom chooses the methodology by project size. Full Scrum makes sense from EUR 30,000 project volume, when multiple team members work in parallel.

### What does the client need to contribute during a sprint?

The product owner prioritizes the backlog and is available for questions. At the end of each sprint, the client reviews the result. Plan 4-8 hours per week during the active project phase.

### How does Scrum work with fixed-price contracts?

The agile fixed price fixes the budget and quality. The scope is prioritized within the budget per sprint. When a new requirement is added, another is deferred. This gives budget certainty with agile flexibility.

## Read more

- [Agile Fixed Price](https://www.arocom.de/en/knowledge/development/agile-fixed-price): The contract model behind Scrum
- [Backlog](https://www.arocom.de/en/knowledge/development/backlog): Prioritizing requirements
- [Project Management](https://www.arocom.de/en/knowledge/development/project-management): How arocom structures projects